TOG
SYSTEMS LIMITED...
|
![]() |
1. Prepare floor surface for installation. 2. Peel of adhesive backing where the crimps are to be placed. 3. Lay the element, where required in strips (or sections) 4. Attach cable to crimps as per installation guide, then cover the crimps with insulating tape 5. Terminate cables into transformer, referring to the installation guide. 6. Install mains cable into transformer via a time controller / thermostat 7. Clear the installation area of any foreign objects before testing the system. 8.
Cover the element with appropriate floor covering following installation
guidelines |
|
tel: 0845 338 6082
|
fax: 0845 338 6085
|
email: enquiries@togsystems.co.uk
|